Wednesday, September 2, 2009

Down to the Nitty Gritty

I am amazed that Sam worked again today. All of the trim is done, except for one window (which we need to buy more of) and the upper molding in the hall (which we also need to buy more of). He really just has the bathroom, finishing up the stairs and the kitchen back splashes. I hope he doesn't putter out.

He have to make a stop at Home Depot tomorrow for some odd stuff: sink stuff, wood seal for the kitchen counters, more tile for the kitchen back splash, more moldings. We need to return the bathroom cabinet we bought. The one we bought was supposed to be recessed into the wall and we didn't plant for that when we did the dry wall.

I put the second coat on the doors and the door trim and a coat polyurethane on the vanity. Exciting I know. At least I'm getting everything done that I have planned. Doors will be done by this weekend and I'll start the other trim as soon as I get more tape. Baby steps now. We're so close to being done.

No comments:

Post a Comment