Yeah, we've become pretty lethargic at this point only going over to the house once a week. I think I'm getting this weird 'it's going to be over soon so prolong it so it won't be over' stupid feeling. Anyway, Saturday we went over and did a little work. Tony scrubbed the bathtub and got a lot of the grout off. I painted the closet and touched up the paint in the hall as well as finished scrubbing the hall floor and got the living room floor mostly ready to be stained (there was dry wall mud in the cracks).
The really exciting part is that there were some lights hung on Saturday, the bathroom, circus room and bedroom. We made a measuring error with the bathroom vanity light. The glass domes overhang the medicine cabinet so it won't open. We can fix it, eventually. We have to fix Sam's shoddy workmanship anyway. Then when we came back on Sunday to check on the basement there were more lights hung, the hall, kitchen, dinning room and bar lights. It was really surprising. If this pace continues the lights will all be done really soon. We have to stop by Home Depot to get a new porch light (the current one is too big). All we have left to do is touch up paint, get the floors stained and have the ducts cleaned and then we can move in. There's still other non-essential stuff to do (clean grout off the bathroom floor, paint the basement stairs, fix the cracks in the basement wall, etc.), but we can do that once we're in.
I didn't bring the camera yesterday to get a pictures of the lights (I didn't expect them to be done) so I take some shots when we stop over today.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment